Solar Farm

About Solar Farm

Scalable Solar Farm Solutions to Power a Greener Future

HOMI delivers turnkey solar farm development services for landowners, investors, and utility partners. Our scalable solutions transform idle land into high-yield energy assets, aligned with Malaysia’s national renewable energy goals. From site evaluation and permitting to engineering, grid connection, and ongoing maintenance — we manage the entire process to ensure seamless delivery and long-term performance.

Why Now?

Now Is the Time to Invest in Solar Farms

Malaysia’s electricity demand is growing, and with strong incentives through LSS and NEM 3.0 programs, solar farms offer a golden opportunity. By exporting solar energy to the grid and securing long-term Power Purchase Agreements (PPAs), investors can unlock stable income, contribute to decarbonization, and strengthen their ESG profile.

Our Pricing

Find The Best Solar Plan For Your Land

Whether you’re a landowner, developer, or energy investor — HOMI offers solar farm solutions that maximize land value, create long-term income, and support a greener energy future.

Custom Corporate Plan

Tailored Utility-Scale Solutions
For large land parcels or commercial sites with grid access — we provide a fully customized solar farm solution to turn your land into a high-performance energy asset.

Tailored Quote

Work Process

We Handle Every Step With Precision

From application to final installation, HOMI ensures a smooth, transparent and professional solar system setup experience for every client.

01

Online Application

Fill in our quick e‑form to start your solar journey.

02

Document Collection

Upload TNB bill, IC copy and basic electricity data.

03

Site & Meter Survey

We visit your roof, capture drone photos and MSB details.

04

System Design & Proposal

Receive a customised package with ROI and NEM 3.0 benefits.

05

TNB / SEDA Submission

HOMI handles all approvals until we get the green light.

06

Agreement & Invoice

Review and e‑sign the service contract; invoice is issued.

07

Payment & Scheduling

Confirm payment; our team books your preferred install date.

08

Installation & Handover

We install, test, and formally hand over your solar system.

FAQ

Popular Question

Thinking about starting a solar farm? These are the questions we hear most.

How much land is needed to build a solar farm?

Most solar farms require 2 to 5 acres per megawatt of capacity, depending on terrain and system design.

What kind of land is suitable for a solar farm?

Flat or gently sloped land with good sun exposure and proximity to grid connection points is ideal. Agricultural, industrial, or unused land can be assessed for suitability.

What is the LSS or NEM 3.0 program and how can I benefit?

These are government-backed incentives in Malaysia that support solar energy deployment. Landowners and developers can apply for Power Purchase Agreements (PPAs) or feed-in tariffs to generate stable income.

Do I need to finance the solar farm myself?

Not necessarily. We offer flexible models including land leasing, co-development, and full ownership EPC packages — allowing you to choose your preferred level of investment and return.

How long does the development process take?

A typical solar farm project takes 6 to 18 months from site assessment to operation, depending on size, permitting, and grid connection requirements.